Shoring scaffolding for Subway in Shanghai
Shanghai Subway is located on Baoshan Road, Zhabei District, it’s one of the major projects in Shanghai. This project need full suspended scaffolding as working platform. The building depth is 51.8m, width is 51.2m, height is 10.55m. Total 2000m².
This project uses Rapid Scaffolding totally. It choose 2*2*10m separate towers to support. The distance between different towers are 4m. It save much scaffolding materials and labor cost, and guarantee the working progress smoothly.
Related cases
-
Wuxi Subway Line 2
-
Shoring system and formwork of Hong Kong- Zhuhai-Macau Bridge
-
Wuxi East Station Platform Formwork Supporting Frame
-
Shoring Formwork for Nanjing Metro
-
Anhui Xuancheng Cast-in-beam Formwork Supporting Frame
-
Shoring system and formwork of Hong Kong- Zhuhai-Macau Bridge
-
Shanghai MIXC Formwork Support
-
Nanjing YOV shoring frame
-
Nanjing Archives Shoring Projects
-
Ma’anshan Exhibition Center Stadium Working Platform
-
Wuxi Subway Line 2