www.rapid-scaffold.comLanguage

Choose your language

CHINESE
ENGLISH
Español
  • Shanghai MIXC Formwork Support

Shanghai MIXC Formwork Support

The Huarun Shanghai MIXC occupies construction area around 530000 square meters, which includes the MIXC shopping center 240000 square meters, the grade A office cluster 140000 square meters, and high-end boutique hotels 30000 square meters.
The project is built by the China Construction Eighth Engineering Division. And the parking lot project in the railway transportation line 10 at Wuzhong road, has taken a special construction technology of large steel beam with super-span air cantilever, which makes it as one of difficulties in this project.
(Herein below called “Rapid Scaffolding”) Rapid Scaffolding, with high strength bearing and good stability, can be adjusted through upper and bottom base jack to meet accuracy requirements at construction site. It has chosen innovative construction technology and successfully resolved urgent problems of 30m high formwork, overweight steel structure, tight schedule, and supporting area at floor.

Advisory

Related cases