On October 27, 2022, the working meeting of the draft consultation of the standard of China Engineering Construction Standardization Association "Technical Regulations for Application of High Strength ringlock Scaffolding" and "High Strength ringlock Scaffolding Members" (hereinafter referred to as "Regulations") was successfully held in the conference hall of Rapid Scaffolding(Engineering) Co., Ltd.
Experts and representatives from Baosteel, Southeast University and Sogeti Molding attended the meeting through online and offline forms. The meeting was hosted by Qin Yafei, senior engineer of Baoshan Iron & Steel Co.
Qin Yafei firstly briefly introduced the background and process of the preparation of the Regulations to all participants. With the start of the first working meeting of the preparation group of the Regulations on November 26 last year, after the joint efforts of the editors-in-chief and the participating units, the draft has now been prepared.
With reference to the content of the provisions in the regulations, the experts and representatives at the meeting discussed carefully chapter by chapter and section by section, and put forward very valuable suggestions for modification, and finally formed the "high strength ringlock scaffolding application technology regulations", "high strength ringlock scaffolding components" of the revision.
To the existing problems, the preparation team said it will be responsible for the relevant sections of the unified revision and improvement, and as soon as possible to form the standard draft for review.
The meeting achieved the expected purpose, for the acceleration of the preparation of the "Regulations" has important significance.