www.rapid-scaffold.comLanguage

Choose your language

CHINESE
ENGLISH
Español

Cantilever Scaffolding Structure on over 100m high roofing- Rapid Scaffolding

This project is a curtain wall work frame for the roof structure of a high-rise building in the Ocean Block of Suzhou City.

Buildings No. 1, 2, 3, 5, 6, 7, and 9 are high-rise structures with a height of 157.29m; Building 8 is a three-story building with a height of 14.45m.

scaffolding project


There is very limited floor space on the roof in all the buildings in this project, but with very height of the roof. Hence, cantilever scaffolding structure proposals were finally adopted in this project design.

scaffold project

It is pretty difficult and dangerous to erect a cantilever structure at the top of the 50-floor buliding.

Among buildings, the largest cantilever length is on the No. 6# and 9# with the same roof structures. Started from the height of 147.09m, cantilever with 1.8m span was set, supported by the outer wall.

More, 1.2m, 1.8m, 2.0m cantilever structures were assembled at the top of the height 157.29m to seal the cornice aluminum plate edge as the cornice working surface. The largest cantilevers were at the southeast, northeast, southwest, and northwest corners of the structure, maximum span 3.2m.

scaffolding drawingscaffolding solutions

scaffold solution

Scaffolding manufactured and supplied by: Wuxi Rapid Scaffolding (Engineering) Co., Ltd.

Project designed and executed by: Rapid Scaffolding engineering team

ringlock scaffolding stock

Another great Job, Rapid Scaffolding engineering team! #rapidscaffolding


For more interest:

Please feel free to contact me:

www.rapid-scaffold.com/en

sales@rapid-scaffold.com